MEKO-Blocked IPDI Crosslinker (Single-Component 1K PU)

In Stock

MOQ

200 kg

Lead Time

10–15 days

Packaging

200 kg steel drums

Specifications

Solid Content70% in xylene/n-BuOAc
Blocking AgentMethyl Ethyl Ketoxime (MEKO)
Viscosity (23°C)1000–3000 mPa·s
Blocked NCO Content14.0–16.0%
Deblocking Temperature140–160°C

FAQ

Full deblocking and crosslinking require 140–160°C for 20–30 minutes (object temperature). At 130°C, cure is incomplete and film properties are compromised. MEKO evaporates during stoving — ensure adequate oven ventilation and check local regulations regarding MEKO vapour emissions, as MEKO is classified under certain jurisdictions as a VOC requiring abatement above threshold concentrations.

Interested in MEKO-Blocked IPDI Crosslinker (Single-Component 1K PU)?

Get a quote, request a sample, or ask a technical question.