Windshield Bonding PU Prepolymer WBP-45

In Stock

MOQ

200 kg

Lead Time

7–14 days

Packaging

20 L pails, 200 kg drums

Specifications

NCO Content1.8%
Density (23°C)1.35 g/cm³
Viscosity (23°C)~80,000 mPa·s (black paste)
Open Time (23°C / 50% RH)20–30 min
Drive-away Time (23°C / 50% RH)≤ 60 min

FAQ

Under standard conditions (23°C, 50% RH), WBP-45 achieves a skin strength sufficient for road-load driving — defined as ≥ 0.35 MPa lap-shear on primed glass — within 60 minutes. At 10°C / 30% RH, allow 90–120 minutes. Cure is driven solely by atmospheric and glass-surface moisture; no heat or UV activation is required.

Interested in Windshield Bonding PU Prepolymer WBP-45?

Get a quote, request a sample, or ask a technical question.